Jurchen Technology · Patented

The PEG® ground-mount racking system

A simplified, high-density ground-mount solution that produces up to 225% more land yield than trackers and fixed-tilt systems — engineered for exactly the markets CatalystGrid serves.

Download the LCOE brochure (PDF) ↗
Jurchen Technology Patented technology by Jurchen Technology. CatalystGrid is the accredited agent for Africa & Islands.
The idea

Less of everything, more energy per hectare

The PEG® is a low-profile, 8-degree east–west design that needs minimal spacing between modules — creating an "ocean of solar panels" on a fraction of the usual footprint.

It is light, mobile and simple to install: no DC trenching, no foundations, no concrete. The module frame becomes part of the structure, so the substructure reduces to just three main components — rod, ground plate, and top/down plate.

  • ✓Up to 50% lower raw-material use for a better CO₂ balance.
  • ✓Installed with hand tools — steel rods rammed in, no heavy machines.
  • ✓Field-proven since 2014 with 200+ plants worldwide.
Design robustness · Track record

Proven against real storms, not just wind tunnels

The PEG® system has stood through some of the most violent weather on record — with no damage to substructure, modules or cables.

CARIBBEAN

Two direct hurricanes, zero damage

Hurricane Ian struck the PEG® EW site in Cuba in September 2022 — a Category 3 storm with winds near 120 mph (≈190 km/h) — leaving the plant intact. In November 2024, Hurricane Rafael hit the same site at 125 mph, again with no damage.

NETHERLANDS

Three severe storms in one season

Storms Zeynep, Ylenia and Antonia hit the Waalwijk landfill site in the Netherlands in early 2022 with winds up to 100 mph (160 km/h) — with no damage to the PEG® substructure, modules or cables.

Why it wins

The benefits that matter on African & island sites

Maximum land yield

Roughly 2.1 MWp per hectare and a ~97% ground-coverage ratio — far beyond fixed-tilt and single-axis trackers where land is scarce or expensive.

Slashed CAPEX

No foundations, concrete, trenching or heavy machinery, with 78% less steel — cutting machine, logistics and labour costs dramatically.

Storm-grade durability

Aerodynamically approved to withstand 185+ mph winds, with a patented down-lift effect — already field-tested through a Category 3 hurricane.

Rapid deployment

Only ~430 man-hours per MWp. A full system ships in as few as two 40-ft containers, ideal for remote logistics.

Smoother daily yield

The flat east–west orientation spreads generation across the day — strong morning and late-afternoon output, less midday peaking.

Low visual & land impact

Around 1 m average height — discreet on landfills, brownfields and sensitive sites, easing permitting and neighbour concerns.

At a glance

Indicative system characteristics

Figures are indicative and vary by site conditions, design and module wattage.

Tilt & orientation8° · East–West
Land yield advantageup to +225% vs FT / SAT
Land density~2.1 MWp / hectare
Ground coverage ratio~97%
Steel reduction−78% vs conventional
Installation labour~430 man-hours / MWp
Wind certification185+ mph (IFI approved)
FoundationsNone — rammed rods, no concrete
Average height~1 m
Track record~750+ MW · 45+ countries · since 2014